The universal floor for every Liquid Rock job: the safety rules we never bend and the quality bar we always hit. Site SOPs add specifics on top โ they never lower this.
| SOP ID | SOP-GEN-006 |
| Version | 1.0 ยท Effective TODO(confirm) date |
| Owner | Owner |
| Applies to | All crew, all sites โ non-negotiable floor |
| Review | Annual, or after any incident / regulation change |
| Hazard | Primary control | Anchor |
|---|---|---|
| Unexpected energization | Full LOTO; verify isolation; shift-change transfer | OHSR Part 10 |
| Arc flash / shock | De-energize + lock out; if live: arc-flash PPE + written SWP | ss.8.31, 19.10โ19.12 |
| Fall from lift/ladder | Harness + SRL; firm/level surface; pre-shift inspection | Part 13 |
| Fire from hot work | Permit; clear combustibles; fire watch + extinguisher | BC Fire Code s.5.2 |
| Struck-by forklift | Walkways/barriers; hi-vis; eye-contact protocol | s.16.6, 8.24 |
| Slip/trip on retail floor | Immediate spill response; cord management; signage | Part 4 |
| Refrigerant / cold | Confirm type + ventilation; cold-exposure limits; buddy | Part 5 / 7 |